20 YEARS OF PROFESSIONAL & DEDICATED SERVICE TO GLOBAL CUSTOMERS

Custom Manufacturing, Project Outsourcing, your Trusted Partner from China

Reducing Downtime: The Impact of Targeted Scale Inhibitors in Papermaking

In the fast-paced world of papermaking, minimizing operational downtime is a constant objective. Unscheduled shutdowns can have significant economic repercussions, affecting production schedules, increasing labor costs, and impacting overall plant output. For the pulp and paper industry, the black liquor evaporation stage is particularly susceptible to downtime due to severe scaling issues. NINGBO INNO PHARMCHEM CO.,LTD. offers a solution: our Scale Inhibitor for Papermaking Black Liquor Evaporators is designed to combat these problems and keep operations running smoothly.

Scaling in black liquor evaporators is not just an efficiency drain; it's a direct cause of unplanned shutdowns. When scale buildup becomes too severe, it can lead to complete blockage of evaporator tubes or a drastic reduction in heat transfer that renders the system inoperable. This necessitates stopping the entire alkali recovery process for cleaning, which can take days or even weeks. Our product acts as a preventative measure, employing its advanced chemical formulation to disrupt the scale formation process. By incorporating dispersants and viscosity reducers, it ensures that the black liquor flows freely and that scale-forming particles do not adhere to critical surfaces.

The economic argument for using effective scale inhibitors is compelling. Reducing the frequency of cleaning cycles directly translates to lower maintenance costs, less consumption of cleaning chemicals, and more consistent production output. Furthermore, by maintaining clean heat transfer surfaces, the energy efficiency of the evaporators is preserved. This means less steam is required to achieve the desired liquor concentration, leading to substantial savings in energy costs. Our specialty chemicals for alkali recovery are therefore not just performance enhancers but also significant cost-reduction tools.

The application of these chemical additives for black liquor evaporation plays a vital role in maintaining the integrity of the evaporator equipment. By preventing aggressive scale formation, it can also help reduce the corrosive effects that sometimes accompany scaling, thereby extending the lifespan of the equipment. For any pulp mill looking to optimize its operations, reduce risk, and improve its bottom line, investing in high-quality scale inhibitors is a strategic imperative.

NINGBO INNO PHARMCHEM CO.,LTD. is committed to providing solutions that enhance the reliability and profitability of the pulp and paper sector. Our Scale Inhibitor for Papermaking Black Liquor Evaporators is a prime example of how targeted chemical innovation can address critical operational challenges and contribute to a more robust and efficient industrial process. Partner with us to keep your operations running at peak performance.

Manufacturing Facilities

NINGBO INNO PHARMCHEM CO.,LTD. was established in 2007. It is committed to the R&D, production and sales of raw materials, pharmaceutical intermediates and fine chemicals. We striving to create a high-efficiency and high-quality integrated chemical service platform to better serve domestic and foreign customers.

Professional Export Experience

to Global Customers

WHY CHOSE US?

1. 20 years of R&D, manufacturing and sales experience, serving customers in 60 countries and regions around the world;

2. Own R&D laboratory, pilot platform and large-scale production workshop, which can meet the audit requirements of global customers;

3. We can satisfy customers' perfect transition from small scale lab requirements (gram level) to commercialization requirements (hundred tons level).

FAQ

  • A: We don't have Minimum Order Quantity, exact quantity should be provided before quotation for us to calculate the exact cost.

  • A: We don't provide free samples due to lots of request and expensive international courier's cost, we can deduct the sample charge after commercial order placed.

  • A: Our payment terms: Small or sample order: T/T IN ADVANCE. Commercial order: First order should be by T/T IN ADVANCE or L/C at sight, and following orders T/T 30~90days is acceptable subject to approval of credit application.

CONTACT US
Should you need to contact us; you may call during regular business hours, Monday through Friday, 8am – 6 pm.
NINGBO INNO PHARMCHEM CO.,LTD.
Address: No.163 Ruiqing Rd.,Ningbo 315000 China
Phone: 86-574-87319282
Fax: 86-574-27912196
SEND US AN EMAIL

NAME*

EMAIL*

COMPANY

COUNTRY*

MESSAGE*

Previous: Improving Evaporator Efficiency: The Science Behind Our Scale Inhibitors

Next: The Science of Dispersants and Viscosity Reducers in Black Liquor Evaporation

All Rights Reserved